Toronto Bathroom Renovation Specialists — Fixed Price, No Surprises, Done Right
The most common bathroom renovation complaint in Toronto: the contractor quotes $35,000, the “extras” arrive one by one, and the final bill is $55,000 — for a bathroom that took four months when they said six weeks.
BCF Contracting works differently. We are a bathroom renovation contractor serving Toronto and the GTA since 2010. Every bathroom renovation — from a powder room refresh to a complete ensuite gut and rebuild — is delivered under a fixed-price contract you sign before we start. Every tile choice, every fixture, every finish is selected and priced before we touch a wall.
We have completed bathroom renovations across North York, East York, Etobicoke, Scarborough, The Beaches, Leaside, downtown Toronto, and throughout the GTA. Our clients range from homeowners upgrading a single bathroom to developers completing full condo gut renovations with multiple suites.
Fixed-price contract. Dedicated superintendent. Real-time BuilderTrend access. 1-year workmanship warranty. Call 647-693-7479.
Bathroom Renovation Services We Offer in Toronto
Full Ensuite Renovation
Complete gut renovation of your primary ensuite — new layout, custom tile, walk-in shower, freestanding tub, double vanity, heated floors, and premium fixtures. Every detail designed and priced before we start.
$45,000–$100,000+
Main Bathroom Renovation
Full gut renovation of a standard bathroom — new tub or shower conversion, tile surround, vanity, toilet, plumbing rough-in, exhaust ventilation, and finishes. Permitted and inspected.
$25,000–$55,000
Powder Room Renovation
Transform a small powder room with new vanity, tile floor, toilet, lighting, and fixtures. Fast turnaround, minimal disruption. A high-impact upgrade for resale value.
$8,000–$20,000
Shower Conversion
Convert a tub-only bathroom into a walk-in shower. Custom tile, frameless glass enclosure, bench seating, niche storage, and rainhead installation. Most popular upgrade for master ensuites.
$12,000–$30,000
OUR PROCESS
Step 1
CONSULTATION
Book a free call to discuss your bathroom renovation. We will ask about your goals, your timeline, and your budget range. No commitment required — we want to understand your project before you understand ours.
Step 2
SCOPE & BUDGET
We visit your bathroom, take measurements, and assess the existing plumbing, electrical, and structural conditions. We prepare a preliminary budget and a detailed Design Agreement covering all selections — tile, fixtures, vanity, shower, lighting — before any work begins.
Step 3
DESIGN & SELECTIONS
Our design team guides you through every selection — tile, grout, fixtures, hardware, glass, lighting. Everything is selected and priced before we sign the construction contract. You know the exact final cost on signing day.
Step 4
FIXED-PRICE CONTRACT
You receive a detailed fixed-price construction contract. Every line item is included. Change orders only apply if you choose to modify scope after signing — and those are always priced and approved by you before any work begins.
Step 5
PROJECT CONSTRUCTION & IMPLEMENTATION
Our crew completes your bathroom renovation with daily progress updates via BuilderTrend. You can log in from your phone at any time to see photos, track the schedule, and communicate with your project manager directly.
Step 6
FINAL WALKTHROUGH
We complete a full quality assurance walkthrough with you before considering the project closed. Any deficiencies are resolved before we leave. Your 1-year workmanship warranty documentation is provided at handover.
COMMUNICATION
Through the BuilderTrend app software, we provide our clients with a clear line of communication. You will also have your very own project manager to lean on every step of the way.
FULL PROJECT MANAGEMENT
When it comes to PM software, we utilize the latest technology. We keep our clients in the loop by providing them with their own login to access our project management software and watch the daily build progress. They can initiate requests, change orders, make selections, or add documents all via their smartphone or home PC.
TRUSTWORTHINESS
Our core belief is to provide an honest, cost-effective, and reliable solution to all of your building requirements. We strive to ensure your experience during the build is a stress-free experience and that we provide you with the highest level of quality through honesty and integrity. With an engineering background, we ensure to provide the best building practices and quality control methods.
QUALITY ASSURANCE
We have a comprehensive 100-point quality checklist that we methodically update throughout the build. We also ensure to document and log all building phase inspections and engineering reports within our PM system. With our team constantly updating progress reports and pictures, you always have access to inspection reports and progress pictures for future reference or modifications.
FAQ's
At What Stage Do I Involve A Builder?
It always pays to get BCF Contracting Group involved early. We encourage utilizing our vast expertise from the start, as our broad knowledge and experience can assist in making the entire process easier. Typically, we are approached once clients have engaged their architect, and we can advise and assist where necessary. However often we are engaged later in the process, often around the building consent stage, and this works exceptionally well also.
Do I Need A Licensed Building Practitioner (LBP)?
You require an LBP for most consented building work. At BCF Contracting Group, we encourage ALL of our carpenters to become Licensed Building Practitioners. This ensures we remain at the top of our field through constant industry training. This brings surety that your building project will be constructed to the highest standard by industry-leading professionals.
Do I Get A Guarantee?
Yes. When you build with BCF Contracting Group, you will receive the best new home guarantee available, the Certified Builders BCF 100% Satisfaction Guarantee. This will bring you surety that the job will be done right. By using BCF Contracting Group, our BCF 100% Satisfaction Guarantee will bring you peace of mind; it is also transferable if you sell your home. In addition, BCF Contracting Group offers you our personal BCF Contracting Group Guarantee, highlighting such benefits as transparency, communication, timing, quality, and care.
Will The Construction Site Be Safe?
At BCF Contracting Group, we pride ourselves on our safety record. As members of WSIB, our health and safety policy is clear and precise. We review and update our site safety requirements constantly, and our team is always all inducted and trained to minimize risk. The site will be regularly cleaned and maintained in a tidy, safe, and professional manner. It is my personal commitment to ensure ALL BCF Contracting Group team members, associated contractors, and site visitors go home safely to their families every night!
Can I Make Changes During The Building Project?
We welcome you to make any changes you would like to enhance your home. Any requests by you or your architect incurring extra labor, contractor, or material costs will be treated as a variation to the contract. All variations will be estimated and presented to you for approval before any such works can proceed.
Using the latest project management software, we keep track of all variances, and change orders are submitted to you for approval before any work is done. This ensures clear and transparent communication and crystal-clear transparency on project cost.
Why Do I Need A New Home Build Specialist – Isn’t All Building The Same?
Building ultra-high-end boutique architectural new homes, compared to building new mid-level or renovation work, is as different as chalk and cheese! A new architectural build requires craftsman experience and knowledge that allows for more creativity in respect to building methodology and material usage. BCF Contracting Group, as an experienced new home build specialist, you can use their knowledge and expertise at every stage. Whether that be in consultation when designing your home, incorporating the latest certified building methods, or material selection, you’ll know you’re in safe hands.
See What Others Are Saying
We assure you that your project will be completed to the highest workmanship standard.
If you need extra assurance, here are some words of praise from previous happy clients.
Download Your Free Guide
Whether you are considering renovating your existing home or building your new dream home, we want to make sure you will have a seamless and stress-free experience by knowing the exact process.
We believe in full transparency and open communication, and to give you an understanding of how easy it is to work with BCF Contracting, we are detailing our building process in 6 easy steps below.
How We Work With You
Have a look at how BCF Contracting Group can help you throughout the process.
Request a FREE Consultation
The first step starts with a 100% FREE, no-obligation consultation with Florin.
Bathroom Renovation FAQs — Toronto & GTA
How much does a bathroom renovation cost in Toronto?
A full bathroom gut renovation in Toronto typically costs $25,000–$55,000 for a standard bathroom, and $45,000–$100,000+ for a full ensuite depending on size, layout changes, and finish level. A powder room renovation runs $8,000–$20,000. BCF provides a fixed-price contract after your free consultation — a real number before we start. Call 647-693-7479.
How long does a bathroom renovation take?
A standard bathroom renovation with BCF typically takes 4–8 weeks from start to completion. A full ensuite gut renovation can run 8–12 weeks depending on scope and any structural or plumbing changes. BCF provides a complete schedule at contract signing so you know every milestone before we start.
Do I need a permit for a bathroom renovation in Toronto?
Plumbing relocations and structural changes require a City of Toronto building permit. Cosmetic updates (new tile, new fixtures in the same location) generally do not. BCF assesses your project and manages any required permit applications on your behalf — included in the contract.
Can I stay in my home during the bathroom renovation?
For most single-bathroom renovations, yes — with some inconvenience during active work phases. If your home has only one bathroom, we plan the project to minimize downtime and discuss temporary solutions during the consultation. For multi-bathroom homes, you always have access to another bathroom throughout.
What bathroom fixtures and tiles do you supply?
BCF works with Toronto’s leading tile showrooms and fixture suppliers. During the Design & Selections phase, our design team guides you through options at your preferred price points. All selections are included in the fixed-price contract before construction begins.
Do you renovate condo bathrooms in Toronto?
Yes — BCF has extensive experience renovating condo bathrooms across Toronto’s downtown core, midtown, and surrounding towers. We manage condo board approval documentation, elevator bookings, and work-hour compliance on your behalf.
Explore More BCF Renovation Services:
→ Kitchen Renovation Toronto — custom cabinetry, stone countertops, full kitchen remodels
→ Basement Renovation Toronto — legal suites, rec rooms, basement finishing
→ All Renovation Services — whole-home renovations and more
→ Condo Renovations — full suite gut renovations in Toronto towers
→ North York Renovation Contractor — everything we build north of the 401
Book a call
Our director, Florin Barbu, will personally conduct the session, which is normally valued at $300.
However, we are offering the session FREE to people that are seriously considering building a dream home to help them make informed decisions towards the next step.